JK‑PB2A16S‑10P / 15P / 20P Iteration Upgrade (V19 upgraded to V24)
Reason for Change
To optimize continuous‑current performance, thermal dissipation and overall product reliability, this series BMS is upgraded from original V19 version to new V24 version.
Key Hardware Modification
The critical physical change is power terminal spacing on PCB:
- Old V19 version terminal spacing:20.70 mm
- New V24 version terminal spacing:37.68 mm
Visual difference: Please refer to before‑&‑after PCB appearance and dimension drawing attached below.
Performance & Compatibility Impact
- Electrical function remains fully compliant; overall performance is improved after iteration.
- ⚠️Important compatibility reminder: The widened power‑terminal spacing will affect existing copper‑bus / bus‑bar fitment.
Existing copper bars made for V19 cannot directly fit V24 hardware. Please double‑check your assembly structure, bus‑bar dimensions before installation. Adjust copper‑bar layout accordingly to match new terminal pitch.
FAQ
Q: Can V19 firmware be flashed onto new V24 hardware?
A: Not supported. V24 hardware matches V24 official firmware only.
Q: Are mounting hole positions changed?
A: Main PCB outer dimension 300 mm ×100 mm keeps unchanged, partial terminal mounting hole layout adjusted due to spacing change. Please check dimension drawing for exact hole location.
Q: When will new‑version units ship?
A: New V24 hardware will be supplied with new production batches; old‑version stock will be phased out upon inventory depletion. Orders will ship whichever hardware version is available in stock.
Q: Can I mix V19 and V24 BMS in parallel battery bank?
A: Not recommended. Hardware terminal difference and internal firmware revision may bring risks for parallel application. Use identical hardware‑revision BMS within one battery pack.
Attachments
- Before‑upgrade PCB appearance (V19)
- After‑upgrade PCB appearance (V24)
- V19 dimension drawing
- V24 dimension drawing
If you have technical questions about this PCN, please contact our support team.